All Opportunities

Find public works subcontracting opportunities posted by prime contractors.

Post Advertisement
DBE

Boulder Street Sidewalk Extension

City of Nevada

LocationNevada City, CA
Bid DateApr 1, 2025
Prime ContractorZZara Construction Inc

1 LS Demolition & Tree Removal 5,600 SF Grading & Subgrade Preparation 1,800 SF Sidewalk 400 LF Curb 80 TN Asphalt Concrete 280 TN Aggregate Base 1 EA Drainage Inlet w/ Pipe Connections 7 EA Adjust Water Meter Boxes and 1 LS Traffic Control

Sub-Bid Due

Apr 1, 2025, 12:00 PM

ClosedPosted Mar 17, 2025
DVBE

Building E College Center

Long Beach City College

LocationLong Beach, CA
Bid DateApr 23, 2025
Prime Contractor22H Construction

Building E College Center

Sub-Bid Due

Apr 23, 2025, 12:00 PM

ClosedPosted Mar 15, 2025
DBE

Shady Lane Mobile Home Park Septic to Sewer & Shady Lane Mobile Home Park Water Consolidation

City Of Coachella 1515 Sixth Street, Coachella, California 92236

LocationCoachella, CA
Bid DateMar 7, 2025
Prime ContractorAAmerican Pipeline Services

Shady Lane Mobile Home Park Septic to Sewer & Shady Lane Mobile Home Park Water Consolidation

Sub-Bid Due

Apr 2, 2025, 10:00 AM

ClosedPosted Mar 7, 2025
DBE

Project Van Nuys Airport Taxiway Reconstruction Project (Taxiways C, H, M, N, P)- Reconstruct 4 Taxiways & Associated Shoulder Pavement, Replace Lighting & Signage In Los Angeles County

LAWA

LocationLos Angeles, CA
Bid DateApr 10, 2025
Prime ContractorSSecurity Paving Company, Inc.

Security Paving Company is looking for quotes from DBE Certified firms. All items including, but not limited to: Potholes, Striping Removals, Underground, Remove AC, Cold Mill Asphalt Pavement, Clear & Grub, Unclassified Excavation, Subgrade Improvement, Subgrade Prep, Subgrade Stabilization Geosynthetic, Base Stabilization Geosynthetics, Crushed Aggregate Base Course, Supply HMA, Slab Replacement, Spall Repair, Hydroseeding, Permanent Striping, Electrical Systems, Guidance Signs, Trucking. PLEASE VISIT THE LAWA BONFIRE WEBSITE FOR THE MOST UP-TO-DATE BID ITEM LIST

Sub-Bid Due

Apr 10, 2025, 1:40 PM

ClosedPosted Mar 7, 2025
DBE

'West Ramp' Parking Lot Repair

Big Bear Municipal Water District

LocationFawnskin, CA
Bid DateMar 28, 2025
Prime ContractorBBig Bear Municipal Water District

9. SCOPE OF WORK. The Big Bear Municipal Water District is requesting bids from qualified companies for a parking lot repair project consisting of the following: SITE: Duane Boyer- West Ramp Parking Lot Repair- 38925 North Shore Drive, Fawnskin, CA 92333: The Big Bear Municipal Water District is requesting proposals from qualified firms for new asphalt, asphalt repair and replacement (where necessary) and repair of damaged curbs, improve drainage to flow west, seal, and stripe services (“Services”), which shall be provided under the general direction of the General Manager or his or her designee. The following describes the specific scope of services as it relates to each task. The District is currently seeking to improve and repair the West Ramp parking lot and driveways by performing the work detailed below. Facility map and striping layout can be seen on our website at https://www.bbmwd.com/requests-for-proposals-environmental-notices-projects . Site Preparation for Cracks 1. Site preparation requirements vary according to the sealing or filling method and materials chosen for the project. The following describes site preparation in further detail. a) When routing or sawing is incorporated, cracks need to be cleaned and dried prior to application of the filler or sealant. When pavements are cracked extensively, routing or sawing of cracks may not be appropriate. Crack cutting becomes especially important in climates where crack movement is very high. Crack cutting allows more filler to be used and provides better control of the crack channel shape. Secondary cracks along the primary crack are not usually routed. Routing is generally not used in HMA or PCC pavements in California. Crack cutting and routing equipment includes vertical spindle routers, rotary impact routers, and random crack saws. Damage to the pavement should be kept to a minimum by clean cutting. The use of carbide bits improves the quality of cutting and typically produces clean reservoir cuts. The following methods should be followed based on crack size defined below: i. Cracks 1/8 to ¼ inch shall be flush filled; 3350’ estimated. ii. Cracks ¼ to 1 inch shall be filled using a combination reservoir with Band- Aid fill method. Backer Rods or sand fill may need to be used on larger deep cracks (where necessary). 6700’ estimated. iii. Cracks larger than 1 inch shall be repaired using the method of ‘open v-shape cuts’ 24” x 4” deep and repave with hot mix asphalt. 100’ estimated. b) Debris left in a crack, resulting from sawing, routing, or pavement use will affect the adhesion of the sealant or filler. Debris also contaminates the sealing or filling material and reduces cohesion. Reduced adhesion or cohesion normally results in early failures. To avoid these contamination-related failures, sawed or routed cracks must be cleaned prior to being treated. Several cleaning methods can be used, including: 1. Air blasting 2. Hot air blasting 3. Sand blasting 4. Wire brushing a. Air blasting involves directing a concentrated stream of air into the crack or joint to blow it clean. Air blasting equipment is effective and efficient for cleaning cracks. Air blasting is not efficient for drying cracks. Should a crack require drying, hot air blasting should be used. Air pressure should be a minimum of 670 kPa (97 psi) with a flow of 0.07 m3 /s (2.5 ft3 /s). Air blasting equipment must be equipped with moisture and oil traps. Hot air blasting is done using a hot compressed air heat lance. While cleaning and drying the crack, hot air blasting also promotes enhanced bonding associated with the crack edges being warmed. Care must be taken to ensure that the pavement is not overheated or heated for excessive periods of time as this will result in unnecessary hardening of the asphalt binder in the pavement adjacent to the crack. b. Sand blasting involves directing a stream of sand entrained in compressed air into the crack. The abrasive nature of the sand cleans the crack or joint. Sandblasting, which is used for cleaning cracks in PCC pavements by many states, is an effective treatment. However, sandblasting is messy and typically requires a two-phase operation. The first operation is cleaning the joint surface; the second cleans the sand from the joint and its surroundings. On new PCC pavements, sand blasting is required to clean the surface prior to applying the sealant. c. Wire brushing or brooming involves the use of a wire broom stock or stiff standard broom to brush out the crack or joint. Wire brushing can be an effective cleaning method. Wire brushing may be done manually or using power driven brushes. 2. If the contractor should damage the edges of the specified area he/she will be required to expand the paving area at no expense to BBMWD. All edges of the specified repair shall be coated with SS1H tack oil. Asphalt must be finished to provide a smooth area. Finish paving must ride “smoothly” and to the satisfaction of the BBMWD representative. Existing edges of the specified areas are to remain free of all new asphalt. a. Power-edge all vegetation away from edges of asphalt. b. Thoroughly clean all asphalt areas to be seal coated so they are free of all dirt and debris. c. Block off work areas while conducting their work, the night before so staff of the district know where to park the following business day as to not disrupt the construction schedule. 3. Seal Coating a. Apply commercial grade asphalt tar emulsion or equivalent which meets or exceeds all the requirements of Federal Government Specification RP-355E along with 2-5 lbs. of sand per gallon of sealer along with a modified latex hardening agent. b. All seal coating work must be performed Monday through Friday ONLY 7AM – 6PM 4. Striping a. Restripe parking lot according to existing layout as seen on exhibits on https://www.bbmwd.com/requests-for-proposals-environmental-notices-projects , after sufficient curing time; minimum five (5) days, maximum thirty (30) days. b. Striping shall be two (2) coated commercial grade acrylic traffic paint in the existing striping on the lot. Approximately 60,160 sq. ft. Contractor to provide exact amounts in bid documents. c. All work must be performed Monday through Friday 7AM – 3:30PM. 5. New asphalt a. New asphalt to be in accordance with 2024 Greenbook section 203 practices including but not limited to; material, installation of aggregate base, tack coat, asphalt concrete pavement, seal coat, compaction, striping and markers. b. New asphalt grade to be returned to original elevation to address existing Cal-Trans culvert drainage issues which will need to be diverted to the west. c. Estimated new asphalt work 4,862 sq ft. Contractor to provide exact amounts in bid documents. 6. Tree Trimming & Removal a. Tree trimming will be required along the designated northwest perimeter of the parking lot; to include disposal. b. Removal of non-native trees will be required during the discard of the west island; to include disposal.

Sub-Bid Due

Mar 28, 2025, 1:00 PM

ClosedPosted Feb 27, 2025
HUD Section 3
VOSB
WOSB
SDVOSB
SBA Section 8(a)
LGBTBE
ACDBE
WBE
MBE
DBE
DVBE
SBE
ELBE
SLBE
CBE
LSBE

IFB 24-097 HSIP RRFB Ramsey Street Pedestrian Crosswalks

City of Banning

LocationBanning, CA
Bid DateApr 15, 2025
Prime ContractorCCity of Banning

Per IFB 24-097 HSIP RRFB Ramsey Street Pedestrian Crosswalks

Sub-Bid Due

Apr 15, 2025, 11:59 PM

ClosedPosted Feb 27, 2025
DVBE

San jacinto high school fence project

san jancinto unified school district

LocationSan Jacinto, CA
Bid DateFeb 27, 2025
Prime ContractorAAB FENCE COMPANY INC

San jacinto high school fence project

Sub-Bid Due

Feb 27, 2025, 12:00 PM

ClosedPosted Feb 26, 2025
DVBE

Baseball Field Upgrades 24-25-004 (Rialto Unified School District)

Rialto Unified School District

LocationRialto, CA
Bid DateMar 5, 2025
Prime ContractorZZECO, INC.

Electrical- Painting and Coating

Sub-Bid Due

Mar 4, 2025, 2:00 PM

ClosedPosted Feb 26, 2025
DBE
SBE

WETA Universal Charging Float Procurement

Water Emergency Transporation Authority

LocationSF, CA
Bid DateMar 31, 2025
Prime ContractorPPower Engineering Construction Co

Seeking quotes for HVAC component of the project. Please note this project requires a signed NDA to access the drawings. We will be submitting our Proposal on Friday March 28th with quotes due to us on Wednesday March 26th at noon. Contact me if interested and I will send the NDA along with the link for the documents.

Sub-Bid Due

Mar 26, 2025, 12:00 PM

ClosedPosted Feb 26, 2025
DBE

DE LA VINA BRIDGE REPLACEMENT PROJECT

City of Santa Barbara

LocationSanta Barbara, CA
Bid DateMar 13, 2025
Prime ContractorLLash Construction

DE LA VINA BRIDGE REPLACEMENT PROJECT

Sub-Bid Due

Mar 12, 2025, 3:00 PM

ClosedPosted Feb 21, 2025
DBE
DVBE

Driver Road Pipeline Project

Southern San Joaquin Municipal Utility District

LocationCA
Bid DateMar 13, 2025
Prime ContractorLLaurel Ag & Water

1. Construct a new PVC waterline from the USBR Lateral 119.6 on Bassett Avenue to the existing groundwater recharge spreading basins west of Driver Road. Connect the pipeline to the existing Lateral 119.6-1.5S south of 9th Avenue 2. Abandon in place the existing USBR Lateral 119.6-1.5S from Bassett Avenue to 9th Avenue. 3. Connect several existing turnouts from Lateral 119.6-1.5S to the new PVC pipeline.

Sub-Bid Due

Mar 6, 2025, 1:00 PM

ClosedPosted Feb 17, 2025
DBE

DOWNTOWN PEDESTRIAN IMPROVEMENTS PROJECT - PHASE II

CITY OF ATWATER

LocationAtwater, CA
Bid DateFeb 27, 2025
Prime ContractorZZara Construction Inc

Construction of new sidewalks, ADA ramps, driveways, and pavement so as to improve pedestrian access on various streets in downtown Atwater, CA

Sub-Bid Due

Feb 27, 2025, 10:00 AM

ClosedPosted Feb 17, 2025
DBE

Project 9587- Construct a new bridge & remove the existing bridge In Stanislaus County On Tim Bell Road

County of Stanislaus

LocationWaterford, CA
Bid DateApr 2, 2025
Prime ContractorSSecurity Paving Company, Inc.

Security Paving Company is looking for quotes from DBE Certified firms. All items including, but not limited to: Develop Water Supply, Construction Area Signs, Traffic Control Systems, Temp. Railing (Type K), Implement BMP's, SWPPP, Temp. Erosion Control, Street Sweeping, Temp. Concrete Washout, Contractor Supplied Biologist, Natural Resource Protection Plan, Temp. High-Visibility Fence, Tree Removal, Clear & Grub, Roadway Excavation, Structure Excavation, Structure Backfill, Ditch Excavation, Subgrade Enhancement Geogrid, Boulder Plaque Installation, Erosion Control, Class 2 Aggregate Base, Supply HMA, Remove AC Pavement, Remove Base & Surfacing, CIDH Concrete Piling, CIDH Piling, Prestressing Cast-In-Place Concrete, Structural Concrete, Joint Seal, Reinforcing Steel, Bridge Removal, Underground, Rock Slope Protection, Rock Slope Protection Fabric, Minor Concrete, Misc. Iron & Steel, Isolation Casing, Bridge Deck Drainage System, Relocate Mailbox, Fencing, Pavement Markers, Roadside Signs, Guardrail Systems, Permanent Striping, Trucking. PLEASE VISIT THE PLANETBIDS WEBSITE FOR THE MOST UP-TO-DATE BID ITEM LIST

Sub-Bid Due

Apr 2, 2025, 9:40 AM

ClosedPosted Feb 13, 2025
DVBE
SBE
ELBE
SLBE

As-Needed Master Planning/Urban Design Consulting Services

San Diego Unified Port District

LocationNational City, CA
Bid DateFeb 19, 2025
Prime ContractorSSWA Group

Requesting Sub-bids from Qualified SBE/DVBE/OBE Subcontractors/Vendors for: Land Use Planning; Transportation and Mobility Planning; Civil Engineering; Environmental Engineering; Environmental Review and Permitting; Entitlement Services; Outreach Services; Feasibility Analysis; Economic Impact Analysis. For information on the availability of plans and specifications and the bidder’s policy concerning assistance to subcontractors in obtaining bonds, lines of credit, and/or insurance, please contact our office.

Sub-Bid Due

Feb 18, 2025, 1:00 PM

ClosedPosted Feb 7, 2025
DBE

Project 07-346304- Install rubberized hot mixed asphalt. In Los Angeles County

Caltrans

LocationLos Angeles, CA
Bid DateMar 13, 2025
Prime ContractorSSecurity Paving Company, Inc.

Security Paving Company is looking for quotes from DBE Certified firms. All items including, but not limited to: Develop Water Supply, Construction Area Signs, Traffic Control Systems, Temp. Striping, Implement BMP's, SWPPP, Temp. Erosion Control, Street Sweeping, Temp. Concrete Washout, Striping Removal, Treated Wood Waste, Remove Concrete, Roadway Excavation, Roadside Clearing, Rock Blanket, Erosion Control, Irrigation Systems, Class 3 Aggregate Base, LCB Rapid Setting, Base Bond Breaker, Segment Correction, Replace AC Surfacing, Supply HMA, Supply RHMA, Place HMA Dike, Place HMA, Tack Coat, Remove AC Dike, Cold Plane AC Pavement, JPCP, Drill & Bond, ISR, Remove Concrete Pavement, Grind Existing Concrete Pavement, CIDH Concrete Pile, Minor Concrete, Clean Expansion Joint, Joint Seal, Sign Structures, Pre/Post Construction Surveys, Misc. Iron & Steel, Electrical Systems, Guardrail Systems, Pavement Markers, Roadside Signs, Veg. Control Mat, Fencing, Concrete Barrier, Permanent Striping, Striping Removals, Trucking. PLEASE VISIT THE CALTRANS WEBSITE FOR THE MOST UP-TO-DATE BID ITEM LIST

Sub-Bid Due

Mar 13, 2025, 1:40 PM

ClosedPosted Jan 29, 2025
DBE

Project 08-1M7404- JPCP (RSC), Rdwy Exc, LCB rapid setting, & HMA (Type A). In San Bernardino County

Caltrans

LocationUpland, CA
Bid DateFeb 20, 2025
Prime ContractorSSecurity Paving Company, Inc.

Security Paving Company is looking for quotes from DBE Certified firms. All items including, but not limited to: Construction Area Signs, Traffic Control Systems, Temp. Striping, Pavement Markers, PCMS Boards, Implement BMP's, SWPPP, Temp. Erosion Control, Temp. Concrete Washout, Contractor-Supplied Biologist, Remove Concrete, Temp. High-Visibility Fence, Clear & Grub, Roadway Excavation, Roadside Clearing, Rock Blanket, Erosion Control, Irrigation Systems, Class 2 Aggregate Base, LCB Rapid Setting, Base Bond Breaker, Prime Coat, Supply HMA, Place HMA Dike, Place HMA, Tack Coat, Remove AC Dike, Cold Plane AC Pavement, JPCP, Joint Seal, Structural Concrete, Underground, Minor Concrete, Misc. Iron & Steel, Permanent Striping, Striping Removals, Electrical Systems, Trucking. PLEASE VISIT THE CALTRANS WEBSITE FOR THE MOST UP-TO-DATE BID ITEM LIST

Sub-Bid Due

Feb 20, 2025, 1:40 PM

ClosedPosted Jan 29, 2025
DBE

Project 07-369704- Construct soldier pile walls, slope protection, and drainage systems. In Ventura County

Caltrans

LocationSomis, CA
Bid DateMar 12, 2025
Prime ContractorSSecurity Paving Company, Inc.

Security Paving Company is looking for quotes from DBE Certified firms. All items including, but not limited to: Construction Area Signs, Traffic Control Systems, Implement BMP's, SWPPP, Temp. Erosion Control, Street Sweeping, Temp. Concrete Washout, Health & Safety Plan, Treated Wood Waste, Remove Concrete, Clear & Grub, Roadway Excavation, Structure Excavation, Structure Backfill, Concrete Backfill, Lean Concrete Backfill, Roadside Clearing, Erosion Control, Temp. Irrigation System, Class 3 Aggregate Base, LCB, Supply HMA, Supply RHMA, Place HMA Dike, Tack Coat, Cold Plane AC Pavement, Drill & Bond, Steel Soldier Pile, Drilled Hole, CIDH Concrete Piling, Structural Concrete, Minor Concrete, Furnish & Erect Precast Prestressed Concrete Box Girder, Bar Reinforcing Steel, Timber Lagging, Clean & Paint Steel Soldier Piling, Bridge Removal, Underground, Small-Rock Slope Protection, Gabion, Concreted-Rock Slope Protection, Rock Slope Protection, Misc. Iron & Steel, Pavement Markers, Guardrail Systems, Roadside Signs, Concrete Barrier, Permanent Striping, Striping Removals, Electrical Systems, Water Meter Charges, Trucking. PLEASE VISIT THE CALTRANS WEBSITE FOR THE MOST UP-TO-DATE BID ITEM LIST

Sub-Bid Due

Mar 12, 2025, 1:40 PM

ClosedPosted Jan 27, 2025
HUD Section 3
WBE
MBE

Blossom Valley Family Center

Catholic Charities of Santa Clara County

LocationSan Jose, CA
Bid DateJan 27, 2025
Prime ContractorWWalker Construction Builders,Inc

Accepting subcontrator bids for commercial T.I. in San Jose. This is a Public Works, Prevailing Wage project. Minority and Women owned businesses are strongly encouraged to bid. Please inquire for plans to bid.

Sub-Bid Due

Feb 10, 2025, 10:00 AM

ClosedPosted Jan 27, 2025
DBE

Project 07-353204- Cold plane AC pavement, place HMA and concrete pavement. In Los Angeles County

Caltrans

LocationLong Beach, CA
Bid DateMar 20, 2025
Prime ContractorSSecurity Paving Company, Inc.

Security Paving Company is looking for quotes from DBE Certified firms. All items including, but not limited to: Construction Area Signs, Traffic Control Systems, Implement BMP's, SWPPP, Temp. Drainage Inlet Protection, Street Sweeping, Temp. Concrete Washout, Asbestos Compliance Plan, Striping Removals, Treated Wood Waste, Sampling & Analysis Plan, Clear & Grub, Roadway Excavation, Structure Excavation, Structure Backfill, Concrete Backfill, Lean Concrete Backfill, Ditch Excavation, Roadside Clearing, Erosion Control, Irrigation Systems, Class 3 Aggregate Base, LCB Rapid Setting, Base Bond Breaker, Crack Treatment, Tack Coat, Replace AC Surfacing, Supply HMA, Place HMA Dike, Remove AC Pavement, Remove AC Dike, Cold Plane AC Pavement, JPCP, ISR, Remove Concrete Pavement & Base, Grind Existing Concrete Pavement, Ground Anchor, Temp. Support, Steel Soldier Pile, Drilled Hole, CIDH Concrete Pile, Structural Concrete, Minor Concrete, Bar Reinforcing Steel, Sign Structures, Timber Lagging, Clean & Paint Structural Steel, Clean & Paint Steel Soldier Piling, Spot Blast Clean & Paint Undercoat, Bridge Removal, Heat Straighten Steel Girder, Underground, Remove Concrete, Pre/Post Construction Surveys, Misc. Iron & Steel, Electrical Systems, Prepare & Stain Concrete, Fencing, Pavement Markers, Guardrail Systems, Roadside Signs, Concrete Barrier, Permanent Striping, Trucking. PLEASE VISIT THE CALTRANS WEBSITE FOR THE MOST UP-TO-DATE BID ITEM LIST

Sub-Bid Due

Mar 20, 2025, 1:40 PM

ClosedPosted Jan 13, 2025
DBE

Foothill Transit Arcadia Hydrogen Fueling Station

Foothill Transit Authority

LocationArcadia, CA
Bid DateJan 30, 2025
Prime ContractorNNicosia Consulting International, llc

Concrete pads and curbs, Fencing, Concrete Demo, Excavation and backfill of Trenches for piping. Will award all as one package or separately.

Sub-Bid Due

Jan 23, 2025, 4:00 PM

ClosedPosted Jan 9, 2025
PreviousPage 8 of 13Next