Scope of Work
Prepare Lead Compliance Plan, Construction Area Signs, Traffic Control (Flagging), Furnish Barricades and Traffic Drums, Furnish Portable Message Signs, Storm Water Pollution Control Plan, Water Pollution Control and Reports, Water Sampling and Reports, Temporary Fence, Clearing and Grubbing, Remove Trees, Excavation and Backfill, Planting and Irrigation, Erosion Control, Grading and Paving, Trucking, 24” Cast-In-Drilled-Hole Concrete Piling, Furnish Readymix Concrete, Bar Reinforcing Steel, Bridge Removal, Drainage, Rock Slope Protection,
Fence, Markers and Roadside Signs, Guardrailing, Concrete Barrier (Type C411 Mod), Striping