Scope of Work
Construction of traffic Construction of a new prefabricated press box that is seismically separated from the existing bleacher building, along with related accessibility upgrades. Specifically:
The press box itself is a new on-grade structure totaling 240 interior square feet plus a 240-square-foot rooftop area, connecting to the existing bleachers (per drawings B1–B17), with a new staircase and landing.
Tied to that, the project also replaces non-compliant portions of two existing systems to serve the new press box: the existing accessible path of travel, and the existing restrooms in the concessions/restroom building (ADA upgrades).
The work also includes site upgrades, low-voltage/AV and network cabling (Category 6A data/telecom for the press box, including an OFOI sports camera such as Pixellot/HUDL Focus), and standard closeout/commissioning items (mechanical/electrical systems fully operational and inspected before partial owner occupancy).