Back to opportunities
Posted Nov 21, 2025ID: #1363
Subcontracting Opportunity
DBE

Carpinteria Advanced Purification Project (CAPP)

City of Carpinteria
Solicitation ID: C-06-836-110
Carpinteria, CA, 93013

Project Information

Bid Due Date

Dec 9, 2025, 10:00 AM

Sub-bid Due

Dec 8, 2025, 4:00 AM

Scope of Work

PROJECT DESCRIPTION: Construction of approximately 4,700 lf of 10-inch and 805 lf of 8-inch PVC purified water pipeline from the AWPF to injection wells located on Linden Ave and Meadow View Lane, including valves, blowoffs, combination air valves, and associated pipeline appurtenances. Construction of approximately 815 lf of 12-inch PVC backwash pipeline from the Linden Injection Well site to the Meadow View Injection Well site. Construction of a gravity backwash pipeline system including approx. 290 lf of 8-inch, 330 lf of 24-inch, and 250 lf of 12-inch gravity pipelines, junction structures, and a connection to the existing sanitary collection system. Construction of approximately 810 lf of electrical duct bank between the injection well sites. ARTICLE 11 – BUILD AMERICA, BUY AMERICA (BABA) REQUIREMENTS: This project requires full compliance with BABA. All iron, steel, manufactured products, and construction materials must be produced in the United States unless a Federal waiver is authorized. Subcontractors and suppliers must provide origin documentation, manufacturer certifications, and BABA compliance statements. DBE OPPORTUNITIES: Traffic control, sawcutting, excavation, trenching, shoring, paving, concrete, erosion control, surveying, materials supply, pipe/valves/fittings, electrical/duct bank, aggregates, trucking, signage, and cleanup. PLANS & SPECIFICATIONS: Available for viewing at: http://tinyurl.com/lashbidding

Project Location

5300 6th St, Carpinteria, CA 93013, USA

Plans & Specifications

  • Contact Us

DBE Requirements

Accepted Certifications

DBE

Prime Contractor

L

Lash Construction

Matthew Doyle

(805) 963-3553

721 Carpinteria St, Santa Barbara, CA 93103, USA