Scope of Work
Project calls for storm damage repair. Major work includes, but is not limited to: Construction of soldier pile retaining walls with tiebacks, Backfill wall and compact, reconstruct roadway, drainage improvements, install midwest guardrail system, erosion control and re-vegetation, traffic control with temporary signals.
Advanced Geotechniques Inc. is seeking bids from qualified D/M/WBE for Construction area signs, Traffic control system, Temporary Railing (Type K), Temporary Crash Cushion, Prepare Water Pollution control plan, concrete supply, fiber rolls, hydroseed, class 2 aggregate base, hot mix asphalt (type A), cold plane asphalt concrete pavement, hot mix asphalt dike (type c and type F), guardrailing supply, steel soldier pile (HP 12 x 84) supply, Midwest guardrail system (steel post), Alternative in-line terminal system (TL-2), Portable signal system, tieback anchor assembly supply.