Scope of Work
Material Testing, Construction Staking, Lead Compliance Plan, Construction Area Signs, Traffic Control, Barricades, SWPPP Plan and Reports, Temporary Erosion Control, Erosion Control, Water Quality Sampling and Analysis, Remove Yellow Traffic Stripe (Haz. Waste), Contractor Supplied Biologist, Bat and Bird Exclusion, Vibration Monitoring, ESA Fencing, Clearing and Grubbing, Roadway Excavation, Imported Borrow, Compost, Class 2 AB, Paving, Furnish and Drive Piling, Furnish and Erect PC/PS Voided Concrete Deck Slabs, Joint Seal, Bar Reinforcing Steel, Bridge Removal, Rock Slope Protection, Reinforced Concrete Pipe, Remove Pipe, Remove Valve Structure, Connector Collar, Discharge Pipe, Meter Structure, Control Box, Pavement Marker, Roadside Signs and Markers, Cable Railing, Guard Railing, Crash Cushion, Concrete Barrier (Type 836), Trucking, Thermoplastic Traffic Stripe.