Scope of Work
Construction Staking, Prepare Lead Compliance Plan, Construction Area Signs, Traffic Control (Detour), Furnish Barricades and Traffic Drums, Prepare Storm Water Pollution Control Plan, Water Pollution Control and Reports, Water Quality Sampling, Temporary Erosion Control, Biologist, Bat and Bird Exclusion, Temporary Fence, Clearing and Grubbing, Excavation and Backfill, Erosion Control, Grading and Paving, Trucking, MID Irrigation Pipe, MID Irrigation Concrete Structures, MID Flap Gates, Cast-In-Drilled-Hole Concrete Piling, Prestressing Concrete, Furnish Readymix Concrete, Joint Seal, Bar Reinforcing Steel, Bridge Removal, Rock Slope Protection, Fence, Signs and Markers, Crash Cushions, Concrete Barrier (Type 836), Striping