Back to opportunities
Posted Jun 13, 2025•ID: #1293
Subcontracting Opportunity
SBE
Calabazas Creek Erosion Repair Project-Miller Ave. to Bollinger Road
Santa Clara Valley Water District
Solicitation ID: Project No. 62084001
Cupertino, CA
Project Information
Bid Due Date
Jun 25, 2025, 2:00 PM
Sub-bid Due
Jun 24, 2025, 2:00 PM
Scope of Work
Project scope includes, but is not limited to repairing and stabilizing channel
banks at three locations.
Hanford is requesting the following trades including but not limited to: Trucking, SWPPP,
equipment rental, aggregate materials, qualified biologist, traffic control, dewatering, Class 8 RSP protection fabric, ½ ton and ¼ ton concreted RSP, method A and method B RSP, tree planting, irrigation, hydroseeding and erosion control materials.
Project Location
Cupertino, CA, USA
Plans & Specifications
- Other
Plans and specs can be downloaded for free at https://www.valleywater.org/contractors/doing-businesses-with-the-district/purchasing-and-contracts, link will direct you to the District’s bidding platform, PlanetBids or at local builder’s exchanges. You can also send an e-mail to our estimating admin asst., Cindy Orme (c.orme@hanfordarc.com) for an e-mailed copy of the plans and specs.
DBE Requirements
Good Faith Effort Outreach
The prime contractor is actively soliciting bids from certified DBE subcontractors for this project. Bidders must submit evidence of their DBE certification.
Accepted Certifications
SBE
Prime Contractor
H