Back to opportunities
Posted Jun 13, 2025ID: #1293
Subcontracting Opportunity
SBE

Calabazas Creek Erosion Repair Project-Miller Ave. to Bollinger Road

Santa Clara Valley Water District
Solicitation ID: Project No. 62084001
Cupertino, CA

Project Information

Bid Due Date

Jun 25, 2025, 2:00 PM

Sub-bid Due

Jun 24, 2025, 2:00 PM

Scope of Work

Project scope includes, but is not limited to repairing and stabilizing channel banks at three locations. Hanford is requesting the following trades including but not limited to: Trucking, SWPPP, equipment rental, aggregate materials, qualified biologist, traffic control, dewatering, Class 8 RSP protection fabric, ½ ton and ¼ ton concreted RSP, method A and method B RSP, tree planting, irrigation, hydroseeding and erosion control materials.

Project Location

Cupertino, CA, USA

Plans & Specifications

  • Other

Plans and specs can be downloaded for free at https://www.valleywater.org/contractors/doing-businesses-with-the-district/purchasing-and-contracts, link will direct you to the District’s bidding platform, PlanetBids or at local builder’s exchanges. You can also send an e-mail to our estimating admin asst., Cindy Orme (c.orme@hanfordarc.com) for an e-mailed copy of the plans and specs.

DBE Requirements

Accepted Certifications

SBE

Prime Contractor

H

Hanford Applied Restoration & Conservation, A Dutra Company

(707) 981-1155

775 Baywood Dr suite 207 p, Petaluma, CA 94954, USA