Back to opportunities
Posted May 8, 2025•ID: #1265
Subcontracting Opportunity
DBE
DVBE
MBE
WBE
Corte Madera Creek Flood Risk Management Project Phase 1 Lower College of Marin Restoration
Marin County Flood Control & Water Conservation District
Solicitation ID: FZ9-25-001-P1
Corte Madera Creek, CA
Project Information
Bid Due Date
May 22, 2025, 2:00 PM
Sub-bid Due
May 19, 2025, 2:00 PM
Scope of Work
Traffic Control and Site Access, Tree Protection, Landscape Boulders-Type A, Landscape Boulders-Type B, Landscape Boulders-Type C, Landscape Boulders-Type D, Site Furnishings, Tree Removal, Earthwork-Imported Compost Fill, Dewatering,SWPPP, 2 Ton Anchor & Field Boulders, 1 Ton Boulders, ¼ Ton Boulders, 9” cobble, 6” cobble, Class II Permeable rock, 6” minus bedding material, Anchored logs and log-rootwads, Double Layer Erosion Control Fabric, Drilled Cast-In-Place Concrete Piers, Decomposed Granite Paving , Fences and Gates, Split Rail Fencing, Wood and Wire Fencing, 6 ft. Black Vinyl Clad Chain-link Fencing, 12 ft wide gates, 15 ft wide rolling gate, Temp. Environmental Exclusion Fencing, Temp. Tree Protection Fencing, Retaining Wall, Grade Beam and Wall Drainage, Planting, Stormwater Utilities
Project Location
Corte Madera Creek, California, USA
Plans & Specifications
- Contact Us
- Other
Plans & Specs are available to view on Builder's Exchange and at our office. Insurance and Bonding information is available per request. Brannon Corporation is an equal opportunity employer.
DBE Requirements
Good Faith Effort Outreach
The prime contractor is actively soliciting bids from certified DBE subcontractors for this project. Bidders must submit evidence of their DBE certification.
Accepted Certifications
DBE
DVBE
MBE
WBE
Prime Contractor
B
Brannon Corporation
Amina Taiyab
(415) 410-7832
10492 Dougherty Ave, Morgan Hill, CA 95037, USA