Back to opportunities
Posted Oct 30, 2024•ID: #1171
Subcontracting Opportunity
DBE
Intersection Improvements at W. Main St. and S. Tegner Rd.
CITY OF TURLOCK
Solicitation ID: CML-5165 (081)
Turlock, CA, 95380
Project Information
Bid Due Date
Nov 5, 2024, 2:00 PM
Sub-bid Due
Nov 5, 2024, 10:00 AM
Scope of Work
Grinding (Cold Plane Method)
Earthwork and Grading
Sheeting, Shoring, and Bracing for worker
protection per CA Labor Law Section
Water Main (12" C900) with Blowoff
Sewer Main (30" SDR-26)
Sewer Cleanout
TID Electrical Conduit (2")
TID Electrical Conduit (6")
TID 42" Irrigation RCP
TID 24" Irrigation C905
TID Control Box (CS 101)
TID Pipe Fittings
TID Drop Inlet (CS 145A)
Relocate Existing Chain Link Fence
Aggregate Base CY 920
Hot Mix Asphalt TN 1290
Temporary Pavement Striping
Adjsut Frame and Cover to Grade (Water G5
Box)
Adjsut Frame and Cover to Grade (Sewer
Manhole)
Adjust Monument Well to Grade
Project Location
W Main St & S Tegner Rd, Turlock, CA 95380, USA
DBE Requirements
Good Faith Effort Outreach
The prime contractor is actively soliciting bids from certified DBE subcontractors for this project. Bidders must submit evidence of their DBE certification.
Accepted Certifications
DBE
Prime Contractor
Z