Scope of Work
Lead Compliance Plan, Develop Water Supply, Temporary Traffic Control, Prepare Storm Water Pollution Prevention Plan, Clearing and Grubbing, Roadway Excavation, Structure Backfill (Culvert), Shoulder Backing, Finishing Roadway, Class 2 Aggegate Base, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type A), Cold Plane Asphalt Concrete Pavement, 18" Corrugated Steel Pipe (.079" thick), Flume Downdrain, Remove Culvert, Remove Downdrain, Remove Headwall, Delineator (Class 1 - Type E), Marker (Culvert), Remove Marker, Roadside Sign - One Post, Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Remove Painted Traffic Stripe, Mobilization, All Trucking and Materials.