Back to opportunities
Posted Apr 8, 2024ID: #1057
Subcontracting Opportunity
DBE

10th Street Rehabilitation - Crosswalk at Bike/ Pedestrian Path to Kern Street

City of Taft
Solicitation ID: STPL-5193(044)
Taft, CA, 93268

Project Information

Bid Due Date

Apr 18, 2024, 2:00 PM

Sub-bid Due

Apr 18, 2024, 2:00 PM

Scope of Work

Site Demolition, Cut & Haul Excess Material, Cold Plane 2-Inch Existing AC Surface, Haul off to Cit Yard, Type "A" Hot Mix Asphalt, Apply Fog Seal on New Pavement, Install 12" Solid Limit/Crosswalk Line-Thermoplastic, Install 24" Solid Crosswalk Line-Thermoplastic, Install 6" Yellow Centerline-Thermoplastic - Detail 22, Install 6" White Laneline-Thermoplastic - Detail 9, Install Yellow Two-way Left Turn Lane-Thermoplastic - Detail 32, Install 8" White Channelizing Stripe-Thermoplastic - Detail 38, Install White Thermoplastic Pavement Markings, Funrish and iNstall-Project Funding Sign for SB1 -C48, Furnish and INstall FYG W11-15 Sign and FYG W16-7P Sign Assembly, Furnish and INstall Blue Retroreflective Fire Hydrant Marker, Adjust Survey MOnument Cover to Grade, Adjust Sewer Manhole Cover to Grade, Quality Control Program, Temporary Traffic Control, Prepare and Implement Water Pollution Control Plan, All Trucking and Materials.

Project Location

S 10th St, Taft, CA 93268, USA

Plans & Specifications

  • "Contact Us" (Promoter)
  • Website / URL
Plans & specs website

DBE Requirements

Accepted Certifications

DBE

Applicable NAICS Codes

23 Construction
2373 Highway, Street, and Bridge Construction
237310 Highway, Street, and Bridge Construction

Prime Contractor

B

Bowman Asphalt, Inc.

Britt Gonzalez

(661) 334-1356

3333 Gibson St, Bakersfield, CA 93308, USA