Scope of Work
Lead compliance plan, time-related overhead, construction area signs, traffic control system, portable radar speed feedback sign system, portable changeable message sign, automated flagger assistance device day, job site management, water pollution control program, temporary drainage inlet protection, street sweeping, shoulder backing, hot mix asphalt (type a), data core, tack coat, cold plane asphalt concrete pavement, detectable warning surface, remove pavement marker, pavement marker (retroreflective), furnish single sheet aluminum sign (0.063"-unframed), furnish single sheet aluminum sign (0.080"-unframed), install roadside sign panel on existing post, thermoplastic pavement marking (enhanced wet night visibility), 6" thermoplastic traffic stripe (enhanced wet night visibility) (broken 12-3), 6" thermoplastic traffic stripe (enhanced wet night visibility) (broken 17-7), 6" thermoplastic traffic stripe (enhanced wet night visibility), 8" thermoplastic traffic stripe (enhanced wet night visibility), 8" thermoplastic traffic stripe (enhanced wet night visibility) (broken 12-3), remove thermoplastic pavement marking, maintaining existing traffic management system elements during construction, all trucking and materials.